Mine Planning

Preliminary open-pit mine design optimisations and mining schedules have been completed on the December 2005 resources. The pit shells at gold prices of A$720/oz (US$560oz) are shown below. These shells drive to the base of drilling in several areas, indicating that potentially economic mineralisation is only constrained by drilling depth.



REGIS RESOURCE LTD. 2006 © | +618 9442 2200